Road Construction Companies
Build the road base and every layer to the specified thickness. Keep aggregate and asphalt consumption within budget.
SITECH Central Asia — an authorized Trimble dealer since 2014

If your fleet includes excavators, dozers, or motor graders, over-excavation, downtime, and rework are costing you money every day.
Build the road base and every layer to the specified thickness. Keep aggregate and asphalt consumption within budget.
Rely less on survey staking at every stage. Stay on schedule and pass inspections without rework.
Excavate foundations and trenches and complete grading in a single pass—without interim surveys or waiting for a surveyor.
Build accurate benches, pads, and haul roads. Monitor elevations directly from the cab.
A machine equipped with 3D grade control strengthens tender bids and supports a higher rental rate.
The bucket removes exactly what is required. The attachment holds the design grade with millimetre-level accuracy, preventing excess use of aggregate, concrete, and asphalt.
Your machines no longer wait for staking. The 3D project model is already in the cab, eliminating stakes, batter boards, and interim surveys.
Work 30–50% faster. Fewer passes and less rework mean completing the same volume in fewer shifts.
Get the result on the first pass. Fewer machine hours per cubic metre of material reduce fuel consumption and equipment wear.
Less experienced operators can achieve expert-level results. The system prevents cutting below design grade and the rework that follows.
See elevations in real time. The system records completed work, giving supervisors a digital view of the surface without waiting for an as-built survey.

The machine sees the entire design surface. Stakes, batter boards, and a surveyor stationed beside the machine are no longer required.
Achieve a smooth surface on the first pass, even with a moderately experienced operator. Over-excavation and unnecessary material removal are eliminated.
The system performs on open sites and in applications that demand maximum elevation control. We select the right configuration for each project.
The system responds instantly to terrain changes and keeps the blade stable. Less vulnerable hardware is exposed outside the machine.
Operators see the design, machine position, and cut/fill values on one screen. The tablet-like interface is intuitive for operators at any experience level.
Choose a package to match the application and budget, from simple planes and slopes in 2D to full 3D model-based operation.
Design updates and progress reports transfer automatically—no USB drives or trips to the jobsite required.
SITECH Central Asia has been an authorized Trimble dealer since 2014, serving Kazakhstan, Kyrgyzstan, and Georgia. Our own specialists handle supply, installation, setup, and calibration. Equipment includes a warranty of at least one year, backed by ongoing service after installation.
Genuine Trimble equipment with a warranty of at least one year.
We install and configure the system for your specific machine.
We train operators on the system using the machine itself.
We support your equipment and provide on-site assistance across Kazakhstan.
We will install the system on your machine, calibrate it, and train your operator. Measure the savings in materials and shifts on a real project before deciding whether to buy. Our manager will confirm rental terms and equipment compatibility.

01The operator controls the stick while the system keeps the boom and bucket on design. Excavate foundations, trenches, and slopes without over-digging.
02The blade automatically maintains design grade for first-pass grading. A mastless configuration keeps receivers and cables off the blade.
03Build profiles and slopes precisely to design, producing a finished base without manual touch-ups.
We also install systems on compactors, asphalt pavers, milling machines, concrete pavers, skid-steer loaders, and wheel loaders. A SITECH specialist will recommend the right configuration.
We thought the system was an expensive gadget. After the first project, we compared actual aggregate use with the estimate and realized how much material we had lost to over-excavation over the years. The system made its own business case.
We expected resistance to having a computer in the cab. In practice, the display was easier to use than a smartphone. Within a few shifts, the team was working in automatic mode and did not want to return to grading by eye.
Previously, someone with a grade rod stood beside every machine. We no longer stake out work for the equipment, so the surveyor can handle surveys and quality control across three sites at once.
Elevations were within tolerance across the entire area, with no issues at handover. We used to reserve entire shifts for touch-ups after levelling checks.
We were concerned about being left alone with the technology. SITECH installed and calibrated the equipment, trained our operators, and answers questions quickly. The system is working instead of sitting idle.
We rented the system for one project to verify the numbers. By the end, it was clear that returning to stakes made no sense, so we purchased it.
Submit the website form or message us on WhatsApp. A manager will ask about your fleet and project requirements.
We inspect the equipment and jobsite, select a configuration for your application and budget, and prepare a quotation.
We install the hardware, prepare the hydraulics, and calibrate the system for your machine.
We train your operators, commission the system, and provide ongoing service support.
